High costs, land delays and grid constraints in scaling up renewable energy: Economic survey
Published on: Jan. 30, 2026, 11:28 p.m. | Source: Times of India
India Business News: NEW DELHI: While the share of non-fossil sources in India’s installed power capacity is rising, the Economic Survey flagged high capital costs, land a.
